REPORT ON THE WORKING OF THE MINIMUM WAGES ACT, 1948 FOR THE YEAR 2001

TABLE 3

MINIMUM WAGES FOR UNSKILLED WORKERS IN SCHEDULED EMPLOYMENT AS ON 31.12.2001

S.NO. Name of the Scheduled Employment Minimum Wages as on 31.12.2001
    Basic D.A. Total
1 2 3 4 5
1.CENTRAL SPHERE
1 Agriculture 67.00 16.02 83.02
    75.00 17.71 92.71
2 Asbestos Mines 28.00 20.90 48.90
    34.00 25.54 59.54
3 Ashpit cleaning in Railways 29.00 21.33 50.33
    42.00 30.61 72.61
4 Barytes Mines 28.00 20.90 48.90
    34.00 25.54 59.54
5 Bauxite Mines 28.00 20.90 48.90
    34.00 25.54 59.54
6 Construction and maintenance of 28.00 20.90 48.90
  Roads and Building operations 36.00 25.54 61.54
7 Construction and maintenance of 28.00 20.90 48.90
  Runways 36.00 25.54 61.54
8 China Clay Mines 28.00 20.90 48.90
9 Copper Mines 28.00 20.90 48.90
10 Clay Mines 28.00 20.90 48.90
11 Chromite Mines 28.00 20.90 48.90
    34.00 25.54 59.54
12 Dolomite Mines 28.00 20.90 48.90
    34.00 25.54 59.54
13  Employment in laying of underground cables, electric lines, water supply lines and sewerage pipe lines Wages not reported
14 Employment of Watch and Ward Wages not reported
  through Private Security Services      
15 Fire Clay Mines 28.00 20.90 48.90
    34.00 25.54 59.54
16 Felspar Mines 28.00 20.90 48.90
    34.00 25.54 59.54
17 Gypsum Mines 28.00 20.90 48.90
    34.00 25.54 59.54
18 Graphite Mines 28.00 20.90 48.90
    34.00 25.54 59.54
19 Granite Mines 28.00 20.90 48.90
    34.00 25.54 59.54
20 Hematite Mines 28.00 20.90 48.90
    34.00 25.54 59.54
21 Iron Ore Mines 28.00 20.90 48.90
    34.00 25.54 59.54
22 Kyanite Mines 28.00 20.90 48.90
    34.00 25.54 59.54
23 Laterite Mines 28.00 20.90 48.90
    34.00 25.54 59.54
24 Loading, Unloading in Railway Sheds 29.00 21.33 50.33
  and Ports and Docks 42.00 30.61 72.61
25 Local Authority Wages not reported
26 Lignite  Mines Wages not reported
         
27 Maintenance of Buildings 28.00 20.90 48.90
    36.00 25.54 61.54
28 Mica works / Mica Mines 28.00 20.90 48.90
    34.00 25.54 59.54
29 Manganese Mines 28.00 20.90 48.90
    34.00 25.54 59.54
30 Magnesite Mines 28.00 20.90 48.90
    34.00 25.54 59.54
31 Magnetite Mines 28.00 20.90 48.90
    34.00 25.54 59.54
32 Marble and Calcite Mines 28.00 20.90 48.90
    34.00 25.54 59.54
33 Ochre Mines 28.00 20.90 48.90
    34.00 25.54 59.54
34 Quartzite Mines 28.00 20.90 48.90
    34.00 25.54 59.54
35 Quartz Mines 28.00 20.90 48.90
    34.00 25.54 59.54
36 Redoxide Mines 28.00 20.90 48.90
    34.00 25.54 59.54
37 Rocksphosphate Mines 28.00 20.90 48.90
    34.00 25.54 59.54
38 Stone Breaking or Crushing 28.00 20.90 48.90
    36.00 25.54 61.54
39 Stone Mines 28.00 20.90 48.90
    34.00 25.54 59.54
40 Steatite (including Soap Stone & 28.00 20.90 48.90
  Talc) Mines 34.00 25.54 59.54
41 Silica Mines 28.00 20.90 48.90
    34.00 25.54 59.54
42 Slate Mines Wages not reported
43 Tanneries and Leather Manufacturing Wages not reported
44 Uranium Mines 28.00 20.90 48.90
    34.00 25.54 59.54
45 White Clay Mines 28.00 20.90 48.90
    34.00 25.54 59.54
46 Volfram Mines 28.00 20.90 48.90
    34.00 25.54 59.54